New trail B.o.B @ 7 Mile

bunch of guys building a trail
The guys hard at work on B.o.B with Matt trying desperately to bury James!
With the recent rain our new trail has been baptised.... B.o.B which stands for Built on Beer. Because that's all it cost to build, after dig beers for GC's. We also found loads of cool old beer bottles and cans from when they built the GY road. Thanks to all who came out and helped throw dirt and hide sticks. Trail is good to ride now but will be soft on the edges and need a few tweaks, we'll let it bed in then head in and fix her up for the long run. Enjoy!

Leave a Reply

Your email address will not be published. Required fields are marked *