7 Mile Update

Mulberry St (named after a passage in the famous Dr Seuss book) is open and ready for business. The first alignment starts on a corner half way down Bliss and runs back towards Queenstown to join the bottom of Loop 7. A higher trail is under construction that starts higher on Bliss and joins onto Mulberry St half way along. The trail is rated intermediate, but has some more advanced options such as the rocky step in the photo attached. It is also proposed to realign the bottom of Metolius to Mulberry St at the next working bee (28th July).  It is still undergoing final tweaks though so be careful and watch out for trail builders!

 

Leave a Reply

Your email address will not be published. Required fields are marked *